Production Profit Calculator
Use observed costs and output to compare batch profits, upgrade gains and incremental equipment payback in Probably Stolen.
Your production scenario
Start with your observed values, or try the math with clearly labeled example inputs.
Raw materials / batch
cr = creditsRunning costs & output
Production economics
Formula & assumptions
Revenue = output × sale price. Recurring cost = materials + energy + other costs. Operating profit = revenue − recurring cost.
Margin = profit / revenue. Payback = equipment cost / positive batch profit, rounded up to whole batches.
Assumes all output sells at the entered price, identical sequential batches and no idle time. Zero revenue has no defined margin. No demand, genetics, quality or efficiency model is implied.
Compare production plans
Save valid scenarios to compare profits, margins and equipment payback.
A higher profit per hour is only comparable when time basis, selling assumptions and resource limits match.
Would the upgrade pay for itself?
Compare your current plan with a changed plan over the same observed period. This shows the difference from keeping your current setup, not the total payback of either machine.
Save the current setup, load it, change only the upgrade-related inputs, then save the changed plan. Keep both plans on the same game build.
Save two valid scenarios to compare an upgrade.
Both batch counts cover the same period. All output sells at your entered prices, with no idle time, shortages or demand limit. The comparison is arithmetic from your inputs, not a verified game forecast.